Groundbreaking ceremony for new workshop at CERAMICO Campus

  • On November 26, the groundbreaking ceremony for the construction of a modern workshop at the CERAMICO Campus in Stoob took place. 

  • By summer 2025, a new building will be built here with space for the vocational school, ceramics school, a testing institute as well as technical and production areas. 

  • In this project, the Woschitz group is responsible for structural planning, local construction supervision, construction coordination, technical building equipment and building physics. We are pleased to be making an important contribution to this pioneering educational project. 

 

Persons from left to right: BM DI (FH) Georg Hafenscher (LIB), Education Director HR OSR Alfred Lehner, Bed MA, Mayor Bruno Stutzenstein, LR Mag. Heinrich Dorner, Director Anita Wolf, GF DI Jutta Benedek (LIB), GF Ing. Frank Pfnier, Arch. DI Andreas Heigl, BM DI Gernot Engerth (both Architekturwerkstatt), Martin Mayer, Managing Director Woschitz Engineering.

 

© State Media Service Burgenland

en_GB