Groundbreaking ceremony for the Austrian Army diving base at Neufelder See
On September 25, 2024, the groundbreaking ceremony for the new Austrian Army diving base at Lake Neufelder took place.
Defense Minister Klaudia Tanner and Mayor Michael Lampel gave the starting signal for the construction project, which is scheduled to be completed by May 2025.
The modern base will be built in solid construction, will have over 545 m² of gross floor space and a boat garage.
Sustainability is the focus of the project, with a wooden walkway and on-site infiltration of surface water.
We provide structural planning, local construction supervision and construction site coordinator services in accordance with BauKG.
Client: Directorate 7 – Infrastructure
General contractor: Pittel + Brauswetter Gesellschaft mbH