Previous slide
Next slide

Penzing house vienna

  • 3 components: high-rise building, low-rise building, connecting structure
  • Reinforced concrete construction
  • Technical building equipment has been completely renewed
  • Controlled ventilation with heat recovery system
  • Facades with full thermal insulation

 

Services: building physics, structural engineering

Architecture: Karl und Bremhorst Architekten ZT GmbH

Completion: 2019

© C.Woschitz

en_GB