Woody M – Tivoligasse residential complex

Previous slide Next slide Woody M – Tivoligasse residential complex Use: Living (130 apartments), supermarket, bicycle garage, common room, underground car park, open space deck. The residential complex in Tivoligasse consists of four components in solid wood construction with 5-6 residential floors, which rest on a reinforced concrete base structure with 2-3 floors. The top edge of the ground drops around 2.5m along the approx. 80m long building, so it is not… Continue reading Woody M – Wohnhausanlage Tivoligasse

Vienna Museum New

Previous slide Next slide Vienna Museum New The museum is pleased to have an expanded net usable area of 12,000m² compared to the previous 6,900m². The listed existing building was expanded, an additional floor was added and a pavilion was extended. New permanent exhibitions and modern office space have been accommodated in the historic building. The vaulted structure provides sufficient space for flexible temporary exhibitions.… Continue reading Wien Museum Neu

Mock Up – On Top Living

Back Previous slide Next slide Mock-Up – On Top Living Immofinanz plans to build apartments over its retail parks Construction Mock-Up – where a model apartment can be viewed Construction of the “Stop Shops” is made possible by a concrete bridge structure Apartments in modular wooden construction Five new residential floors Mock-Up: Wooden modules were built into a model apartment with exposed wooden surfaces… Continue reading Mock-Up – On Top Living

DSL³ Eisenstadt

Back Previous slide Next slide DSL³ Eisenstadt New laboratory and research building "Informatikum" for FH Campus in Eisenstadt Modern and future-oriented object in wooden construction Ground floor: meeting rooms, the cube for research work, Fab Lab, workbench with workstations Upper floor: office space Research activities: cloud computing, Internet of Things, Industry 4.0, energy systems of the future Services: local construction supervision construction and technical… Continue reading DSL³ Eisenstadt

BRG Sillgasse Innsbruck

Back Previous slide Next slide BRG Sillgasse Innsbruck New building Three components Inner courtyard Gross floor area: 12,160 m² BIM project Middle component: Main entrance, central staircase, library, administration, special teaching rooms, student laboratory Side components: Dining room, connectable multi-purpose rooms, classrooms, open learning zones, terrace, open-air classroom for urban gardening Basement: Two sports halls, building services center, storage rooms Services: Building physics Client: BIG Bundesimmobiliengesellschaft mbH Architecture: SOLID architecture ZT… Continue reading BRG Sillgasse Innsbruck

Circular gymnasium Steigenteschgasse

Back Previous slide Next slide Round gymnasium Steigenteschgasse Services: Building physics, structural engineering Architecture: Raumkunst ZT GmbH Completion: 2022 © Romana Fürnkranz

Project template

Previous Previous Next Project title Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus… Continue reading Project Template

Village school in the sky

Back Previous slide Next slide Village school in the sky New school: 10 classes, 6 day-care groups, 1 shared apartment, cafeteria Old school renovated Foundations reinforced New construction of the floor structures, interior walls Attic reinforced with a steel frame construction Extension in reinforced concrete and timber construction Services: Building physics, structural planning Architecture: goya ZT GmbH, MAGK Architektur ZT OG Completion: 2020 © Hertha Hurnaus

Demolition of the Ferry-Dusika Stadium

Previous slide Next slide Demolition of Ferry-Dusika Stadium Ferry-Dusika Stadium demolished due to construction of new Sport Arena Vienna Spectacular demolition of the sophisticated steel membrane roof Span approx. 120m to be covered with a 4mm thin steel sheet Challenge: finding the right cutting sequence to ensure a controlled failure of the membrane construction Service: static monitoring of the demolition © City of Vienna Back

TÜWI Vienna

Back Previous slide Next slide TÜWI Vienna Nomination Shortlist State Prize for Architecture and Sustainability ÖGNI Platinum certified New building BOKU Vienna Heating and cooling using geothermal energy via a heat pump Photovoltaic system Solar thermal system for hot water preparation Facade made of larch wood Services: Local construction supervision, planning coordination Architecture: Maurer & Partner ZT GmbH Completion: 2018 © C. Woschitz

en_GB