Previous slide
Next slide

Office building Anschützgasse

  • 7 floors
  • Hybrid design
  • Reinforced concrete ensures stability and load bearing in the basement and basement floors
  • floors above in hybrid construction
  • Offices are built in hybrid construction of glulam in the form of supports and beams as well as a wood-concrete composite ceiling
  • Wall panels and floor slabs are made of prefabricated cross-laminated timber panels

 

Services: building physics, structural engineering

Architecture: WGA ZT GmbH

Completion: 2019

© C.Woschitz

en_GB