Previous slide
Next slide

Innovative wooden construction: SINK.CARBON demonstrator presented

  • On October 7, the demonstrator of the SINK.CARBON research project was presented to the public.

  • This project aims to keep wood-hybrid building elements in the cycle for as long as possible and thus create a real CO₂ sink.

  • In cooperation with our partners Handler Bau, Wood K Plus and the BOKU Vienna A modular system was developed that is geared towards maximum recyclability and ecological benefit.

  • The demonstrator, which will be at the Handler company's site in Neutal until November, will then be dismantled and rebuilt at our research partner Wood K Plus in Tulln. Here, the modular system will be further demonstrated with modified room proportions.

  • We are pleased to be able to contribute to climate-friendly construction with this innovative approach and to help shape future construction methods.

 

press text

© Christoph Bauer, Woschitz group

en_GB