Previous slide
Next slide

Bypass Bridge Linz

  • Length of the VOEST bridge: 407 meters
  • Main opening with free span of 215 meters
  • Pylon height 66m, each anchored with three parallel cables
  • 6 lanes
  • separated by a pylon into two lanes

 

Services: structural engineering

Architecture: SOLID architecture

Completion: 2022

© Kurt Kuball

en_GB